16
o
u
n
c
e
s
410.221.8009
• Pre-Buy & Conditional Inspections • Check Rides • Tailwheel • Flight Reviews • Certified Rotax Service & Heavy Maintenance
S-9 CHAOS
PRINTABLE FORMS
HIGHLIGHTED FEATURES
AIRFRAME
Rotax engine install kit
4130 welded steel fuselage and tail group
Heat treated steel landing gear
3" main spars
2" aft spars
Hydraulic toe brakes
Full span 2:1 differential ailerons
Aluminum leading edge wrap
5" aluminum wheels and aircraft tires
PVC aileron gap seals
Trussed ribs
9 gallon wing tank
Headertank
Adjustable seat fore and aft
Welded aluminum one-piece canopy frame
2.7 oz aircraft covering fabric
All surface tapes, glue, lacing, inspection plates and exit covers
In-flight pitch trim
"Deep set" panel
Roll-over protection
Dual elevator horns
Push-pull elevator tube
Cable operated rudder
Pre-molded cowling and composite spinner
Heavy duty 4130 welded steel engine mount with 4 point isolation
Under the wing windows
Cockpit air inlet vent
Fuselage foot peg and wing step
Ball bearing aircraft control pulleys
Folding tail
Wings remove in minutes, for transport
Dual cable braced tail
Steerable tail wheel
Wheel pants
Aluminum airfoil struts
Steerable tail wheel
Firewall sound proofing
Shoulder harness and lap belt
ENGINE RELATED OPTIONS
Electric Starter Kit/Standard with Rotax 912 install kits
Aerobatic Package
OTHER OPTIONS
Headrest
Powder coat engine mount and tail
Tinted glass
Heater, Muffler style-503/582
2nd 9 gallon wing fuel tank
Rear Window
Streamline footstep
Gascolator
Main gear leg fairing
Strobe mount kit
Adjustable lift strut kit
Aileron spades
Hooker harness (recommended with purchase of
Aerobatic package)
The S-9 Chaos is a FAA approved 51% kit
No welding required.
Build Time: 300-500 hours